E DREJTA PROCEDURALE CIVILE NDËRKOMBËTARE(Arbitrazhi ndërkombëtar) Emri,mbiemri dhe nr.i. 16 E drejta e Arbitrazhi dhe e Ndermjetesimit Nderkombetar Tregtar, Suela Mëneri, fq. 17 Hassneh Insurance Co and others v. Steuart. OBT, WIPO, Arbitrazhi Fjalorth OBT- Organizata Botërore e Tregtisë WIPO – Organizata Botërore e Pronësisë Intelektuale IP- Pronësia.

Author: Gagami JoJozilkree
Country: Italy
Language: English (Spanish)
Genre: Travel
Published (Last): 16 July 2010
Pages: 402
PDF File Size: 18.52 Mb
ePub File Size: 12.89 Mb
ISBN: 204-6-51275-151-8
Downloads: 57780
Price: Free* [*Free Regsitration Required]
Uploader: Dumuro

Their type, number and depth should be such that the geotechnical structure of the area is defined completely and without uncertainties sufficient depth and width.

Shoqata e Bankave ka një informatë shumë të rëndësishme pë bizneset

Numerical methods for the solution of ordinary and partial differential equations. The core-box will fill the whole frame of the photograph, and a photographic colour chart KODAK will be included in each photograph. However, given the uncertain nature of this project both in planning and feasibility, it was decided at the preliminary design stage not to include the impacts of the lake within the project road upgrade.

In this Sub-Consultancy Agreement words and expressions shall have the same meanings as are respectively assigned to them in the Conditions, hereinafter referred to. Values of CBR shall be estimated from the number mm penetration per blow using arbitrazi recommended formula. In open land any surplus shall be heaped proud over the pit site. Rigid core spacers shall be used to indicate any missing lengths. This Convention is the most significant one with respect to international commercial arbitration.

Artificial light shall be used to light up the part of the excavation in shadow so as to reduce light contrasts. Locations for potential new quarries should be identified and inspected paying attention to access and availability of water. If specimens with these dimensions cannot be obtained, a Point Load Test should be applied as an alternative. All computer results shall be summarised in an understandable table.

At this nderkombetat the tender design route passes at the edge of the Vosjes flood plain ndekrombetar a level as low as 96m above datum. All volumes shall have page numbers and a table of contents. From trial pits, at least one disturbed sample shall be taken from each discrete layer. These two international instruments were key in the development and promotion of international arbitration as they established new, pro-arbitration standards.

Related Posts  ELECTRO VOICE DX38 PDF

In fact any mitigation measures due to the proposed dam would have been far more consequential on the local environment than simply raising the road.

At least one disturbed soil sample shall be extracted from each soil layer, or at every 3 m in homogenous soil. Other constraints along the site include the presence of a major utilities and cemeteries.

Similarly geological sections shall be prepared for unstable slopes showing the relative positions of the proposed road, existing ground profile, interpreted back scarps, cracks, probable slip surface, ground water phreatic surface, slip debris etc.

All existing or former quarries shall be visited, outcrops studied and samples taken. Etika profesionale e psikologut ligjor.

Another important convention is the European Convention on International Commercial Arbitration which is the most important regional instrument. Whereas on the 5th May the Contractor has provided a Letter of Intent to employ the Consultant for the redesign of the modied alignment.

In cohesive soils at least one sample should be taken from for each soil layer or at least every 3 m in homogenous soil. The second call for applications for student mobility at the University of Salerno http: Master of Sciences in Computer Engineering. Master of Sciences in Electronic Engineering.

The study should identify any problem zones that might justify a variation to arbigrazhi horizontal or vertical alignment or require special nderkombetaar to ensure stability. Psikologji edukimi 6 9. In consideration of the payments to be made by the Consultant to the Sub-Consultant, as hereinafter mentioned, the Sub-Consultant agrees to perform the Sub-Consultant’s Services in conformity with the provisions of the Sub-Consultancy Agreement.

Winning candidates for the second cycle of studies. From the studies of the terrain, this geological map will show the limits between the different geological formations, and all the visible phenomena relevant for defining the engineering-geological and hydrogeological problems of the terrain landslides, rock falls etc.

Related Posts  DOS IZQUIERDAS TEODORO PETKOFF PDF

Refer to Clause 4. Finally, international arbitration is governed by bilateral and multilateral treaties, including bilateral investment treaties or investment protection agreements, providing protections for investments against for instance expropriation, and bilateral friendship, commerce and navigation treaties, which deal only incidentally with international arbitration.

Vote Promote or demote ideas. Contract Programme Appendix 2: Data security Created by Evelio Clavel-Rosales. Term search Jobs Translators Clients Forums. The level at which water seeps are observed shall be recorded. Sorry, your blog cannot share posts by email.

Undisturbed nderkombeetar taken using an open ended sampling tube shall be sealed using aluminium foil sealed with paraffin wax.

The above list is not exhaustive. The width of the survey shall not be smaller than m i.

International competition in the field of commercial law and arbitration |

Praktika Profesionale 5 2. Because this person is not a ProZ. Master of Sciences in Information Technology.

Areas of soft ground where embankment stability and settlement may be a problem should be identified and proposals planned for their investigation.

All computer listing shall be in separate volumes. Undisturbed core samples shall be covered with paraffin and aluminum paper, and transported by properly trained persons.

A visual survey of the existing road that lies within or close to the proposed new road corridor shall be carried out noting nderkombftar carriageway and shoulder width, and the condition of the surfacing in terms of cracking, patching and rutting depth or deformation.

The samples from hard rock should have a dimension H height: It was signed on 21 April and came into force in It is usual that retaining structures will be used in the part of the alignment.